1800 858 723ULTRAdesigner

We wish to advise no flooring products will be available after 30 September 2023.

Taking the work
out of formwork

Ultrafloor is a privately owned Australian company celebrating its 30th year of providing the Australian construction sector with innovative precast concrete flooring solutions.

Ultrafloor manufacture a wide range of precast concrete beams and lintels and provides an extensive variety of flooring systems to satisfy the requirements of all residential and commercial projects. From Houses to High-Rise, and everything in between.

With an estimated 50% market share, Ultrafloor produces six kilometres of beams per day and has provided building sites nationwide, in excess of seven million square metres of Ultrafloor to date.

30
Years of Experience

in precast concrete flooring

7,000,000

Metres of beams to date

50

Percent Market Share

12,000

Projects Completed

OUR PROJECTS

Education and Social,

University Square Carlton

Ultrafloor provides extensive benefits in the student accommodation sector. Ultrafloor can provide a full D&C package on your next student accommodation project.

View Project
Hotels,

Veriu Green Square

Ultrafloor is regularly used on hotel projects as our system provides fast and prop free flooring solutions which enables the pre-loading of bathroom pod units.

View Project
Retirement, Aged & Health Care,

Ryman Healthcare Burwood

For RACF projects, Ultrafloor is your one stop precast flooring partner where we undertake the full design and construct process from start to finish.

View Project

Less waste and increased thermal ratings

No wasted timber formwork is required and thermally efficient floors lead to a reduction in long term heating and cooling costs over the life of a structure.

Environmental

Concrete and reinforcement savings

Average concrete volumes are reduced by 20% to 45%, with a standard 32Mpa mix typically specified and reinforcement rates are reduced by up to 50% as the Ultrafloor beams also act as bottom reinforcement.

Cost Savings

Greatly reduced construction time

Beams can be delivered and installed as soon as 2 to 4 weeks after an order is placed. Up to 500m2 of Ultrafloor can be installed by a single 5 person crew per day.

Speed

Some of Ultrafloor's valued customers include

Contact Us